News
![]() |
Agrinz is selected as Technology Provider for the industrial waste processing biogas plant “SanMartin” in Nicaragua
Published: 07-11-2014 Agrinz provides the technology and the entire project engineering for a new industrial waste processing biogas plants with an output of 4.150.000 Nm³ biogas per year. The needed waste input of ~150 t/d are industrial byproducts read more |
||||
![]() |
Agrinz along with its partner BioEn, are invited as speakers at the Nicaraguan Green Energy Conference
Published: 01-10-2014 Mr. Gregor Agrinz, CEO of Agrinz Technologies and Mr. Earl Brubacher, Manager of operations from BioEN Canada has been invited to speak at the Conference with the main topic "Economic, environmental and social benefits through the use of biogas read more |
||||
![]() |
Agrinz is selected as Technology Provider for two new waste processing biogas plants in Brazil
Published: 01-08-2014 Agrinz together along with its local partner Geoklock, provides the technology and the entire project engineering for two new waste processing biogas plants with an output of 11.800.000 Nm³ methane per year each plant. read more |
||||
![]() |
|||||
![]() |
Successful start up of the 3rd biogas plant in Canada by Agrinz Technologies Published: 01-07-2014 After a one-year construction time, Agrinz did the start-up of their 3rd biogas plant in Canada. The plant “Biogas Plant Elmira” processes 70.000 t/a of waste materials and produces power of 2.8 MWel. read more |
||||
|